S3: 3 Increase bridge design precision with automated construction sequence calculations
BridgesRoad and Infrastructure
Information
In this webinar, we will take a detailed look at how intelligent algorithms can interpret a defined construction schedule and create a construction sequence calculation – including generation and calculation of automatic load cases, time-dependent analysis and load case summation. Furthermore, we will demonstrate how an engineer can have full control over the complete process and how to check all the results.